Search

Paul Sriberg Phones & Addresses

  • 70 Hope Ave, Waltham, MA 02453 (781) 373-3159 (781) 373-5005
  • 19 Saint James St, Palm Bch Gdns, FL 33418 (561) 626-9170
  • 19 Saint James Dr, Palm Beach Gardens, FL 33418 (561) 626-9170
  • 4521 Pga Blvd, West Palm Beach, FL 33418
  • Framingham, MA
  • 19 Saint James Dr, Palm Bch Gdns, FL 33418 (561) 352-5019

Work

Position: Food Preparation and Serving Related Occupations

Education

Degree: Associate degree or higher

Emails

Business Records

Name / Title
Company / Classification
Phones & Addresses
Paul L. Sriberg
Controller
Teco Industries of Maryland Inc
Administrative Office
19 Saint James Dr, West Palm Beach, FL 33418
(561) 626-9170
Paul Sriberg
President
APPLIED METAL SYSTEMS CO., INC
29 Pne Hl Rd, Southborough, MA 01772
29 Pne Hl Rd, Southboro, MA
Paul Sriberg
President
FERRODECK,INC
161 Highland Ave SUITE 205, Needham, MA 02194
29 Pne Hl Rd, Southborough, MA 01772
Paul Sriberg
President
METAL WALL SYSTEM CORP
PO Box 13, Hopedale, MA 01747
29 Pne Hl Rd, Southborough, MA 01772
Paul L. Sriberg
President
Concerned Homeowners Association of Ballen Isles, Inc
515 N Flagler Dr, West Palm Beach, FL 33401
Paul Sriberg
President, Director
Roll Form Products, Inc
89 State St, Boston, MA 02109

Publications

Us Patents

Floor System

View page
US Patent:
41516940, May 1, 1979
Filed:
Jun 22, 1977
Appl. No.:
5/808871
Inventors:
Paul L. Sriberg - Framingham MA
David M. Berg - Needham MA
Assignee:
Roll Form Products, Inc. - Elk Grove Village IL
International Classification:
E04B 519
US Classification:
52665
Abstract:
The system is preferably for use in building construction where concrete floors can be poured in place. The components of the system comprise parallel arranged joists preferably each constructed from three pieces to form an I-beam joist, bracing channels extending orthogonally between adjacent joists and mated at their respective ends with the joists, means for securing and bracing channels in place relative to the joists, and corrugated metal decking extending in separate sections between adjacent joists and over the bracing channels. Concrete is poured over the metal decking and interlocks with the top end of each joist to form a structurally securely supported, poured-in-place concrete floor.
Paul L Sriberg from Waltham, MADeceased Get Report