Search

Joanne Stahler Phones & Addresses

  • Mill Creek, WA
  • Richland, WA
  • Lake Forest Park, WA
  • Phoenix, AZ
  • Kiona, WA
  • Kennewick, WA
  • 19554 44Th Ave NE, Lk Forest Pk, WA 98155

Work

Company: Boeing Jul 1, 2012 Position: Senior project engineer - bca engineering for government programs

Education

Degree: Bachelors, Bachelor of Science School / High School: Arizona State University 1989 Specialities: Engineering

Skills

Aerospace • Aerospace Engineering • Reliability Engineering • Nuclear Engineering • Nuclear Physics • Nuclear Safety • Safety Analysis • Nuclear Power Plants • Nuclear Power Plant Operations • Project Portfolio Management • Project Engineering • Fault Tree Analysis • Invention Disclosure Process • Patent Application Process • Intellectual Property • Probabilistic Safety Assessment • Probabilistic Risk Assessment • Probability • Probability Theory • Probabilistic Models • Risk Assessment • Event Tree Analysis • Safety Engineering • Systems Engineering • Engineering • Engineering Management • Root Cause Analysis • Mechanical Engineering • Simulations • Process Engineering • Earned Value Management • Six Sigma • Lean Manufacturing • Manufacturing • Continuous Improvement • Product Development

Industries

Aviation & Aerospace

Resumes

Resumes

Joanne Stahler Photo 1

Senior Project Engineer

View page
Location:
Bothell, WA
Industry:
Aviation & Aerospace
Work:
Boeing
Senior Project Engineer - Bca Engineering For Government Programs

Boeing 2006 - Jul 2012
Senior Project Engineer - Airplane Product Development

Boeing 2003 - 2006
Senior Technology Integration Engineer

Boeing 1997 - 2003
Senior Reliability Engineer

Arizona Public Service (Aps) 1992 - 1997
Senior Engineer - Probabilistic Risk Assessment
Education:
Arizona State University 1989
Bachelors, Bachelor of Science, Engineering
Skills:
Aerospace
Aerospace Engineering
Reliability Engineering
Nuclear Engineering
Nuclear Physics
Nuclear Safety
Safety Analysis
Nuclear Power Plants
Nuclear Power Plant Operations
Project Portfolio Management
Project Engineering
Fault Tree Analysis
Invention Disclosure Process
Patent Application Process
Intellectual Property
Probabilistic Safety Assessment
Probabilistic Risk Assessment
Probability
Probability Theory
Probabilistic Models
Risk Assessment
Event Tree Analysis
Safety Engineering
Systems Engineering
Engineering
Engineering Management
Root Cause Analysis
Mechanical Engineering
Simulations
Process Engineering
Earned Value Management
Six Sigma
Lean Manufacturing
Manufacturing
Continuous Improvement
Product Development

Publications

Us Patents

A System And Method For Schedule Interrupt Cost Analysis

View page
US Patent:
20080034368, Feb 7, 2008
Filed:
Aug 1, 2006
Appl. No.:
11/461711
Inventors:
Joanne L. Stahler - Mill Creek WA, US
International Classification:
G06F 9/46
US Classification:
718102
Abstract:
A system and method for performing cost analysis on airplane schedule interruptions comprises entering data relating to schedule interrupt events. All schedule interrupt events for a specified period of time are then summarized. Partial schedule interrupt event counts are removed when calculating average delay hours associated with a particular schedule interrupt event grouping. An average total delay cost per schedule interrupt event type is calculated wherein the partial schedule interrupt event counts are used in the calculation of average total delay cost per schedule interrupt event type.
Joanne L Stahler from Mill Creek, WA, age ~66 Get Report