Search

Brookes Baker Phones & Addresses

  • Austin, TX
  • Edgecliff Village, TX
  • Wylie, TX

Professional Records

License Records

Brookes Hampton Baker

Address:
5 Chelsea Dr, Fort Worth, TX 76134
License #:
46967 - Expired
Category:
Engineers
Issued Date:
Jul 12, 1993
Effective Date:
Mar 14, 2017
Expiration Date:
Feb 28, 2017
Type:
Professional Engineer

Brookes Hampton Baker

Address:
Fort Worth, TX 76134
License #:
003022 - Expired
Category:
Engineers
Type:
Engineer Temp Authority to Practice

Resumes

Resumes

Brookes Baker Photo 1

Consulting Engineer

View page
Location:
Fort Worth, TX
Industry:
Civil Engineering
Work:

Consulting Engineer
Brookes Baker Photo 2

Brookes Baker

View page

Business Records

Name / Title
Company / Classification
Phones & Addresses
Brookes H. Baker
Principal
Baker Brookes Inc
Business Services at Non-Commercial Site
5 Chelsea Dr, Fort Worth, TX 76134
Brookes Baker
Principal
LANDMARK WIND POWER LP
Business Services at Non-Commercial Site · Business Services, Nec, Nsk · Nonclassifiable Establishments
5 Chelsea Dr, Fort Worth, TX 76134
Brookes H Baker
CROSSROADS GENERAL LC
5 Chelsea Dr, Fort Worth, TX 76134
Brookes H Baker
President, Treasurer, Secretary, Director
BROOKES BAKER, INC
5 Chelsea Dr, Fort Worth, TX 76134

Publications

Us Patents

Facility For Producing Electrical Energy From Wind

View page
US Patent:
20110304142, Dec 15, 2011
Filed:
Jun 15, 2011
Appl. No.:
13/161471
Inventors:
Brookes H. Baker - Fort Worth TX, US
International Classification:
H02P 9/04
F03D 9/00
US Classification:
290 44, 290 55
Abstract:
A facility for producing electrical energy has a plurality of shrouds, a plurality of wind turbines, a power system, a plurality of modules, a pivotal mounting system, and a support structure. Each shroud has a throat which increases the velocity of the prevailing wind passing through the shroud. The plurality of wind turbines are each operably positioned in the throat of one of the plurality of shrouds. The power system is adapted for converting mechanical energy from the plurality of wind turbines to electrical energy. The support tower includes a central tower for supporting the shrouds and wind turbines above the surface, and may further include peripheral towers, guys, and/or other structural components.

Method For Erecting A Facility Producing Electrical Energy From Wind

View page
US Patent:
20130067853, Mar 21, 2013
Filed:
Nov 12, 2012
Appl. No.:
13/674912
Inventors:
Brookes H. Baker - Fort Worth TX, US
International Classification:
E04H 12/20
E04H 12/34
US Classification:
5274517
Abstract:
A method for erecting a facility includes the steps of constructing initial tower panels on a foundation. Work platforms and guys are installed so that additional tower panels may be installed on top of the existing tower panels. The work platforms with guys may then be raised, so that the process may be repeated until tower section height is reached. Tower sections are them completed by the addition of peripheral trusses and permanent guys, and additional tower sections are constructed by repeating the process to reach the desired facility height. Lifting units including truss and rail systems and rotatable modules with turbines in shrouds are assembled on the ground, then raised up the towers and operably mounted for generating electricity from wind. The erection process is sequenced to maintain structural integrity.

Method For Erecting A Facility For Producing Electrical Energy From Wind

View page
US Patent:
20110302879, Dec 15, 2011
Filed:
Jul 22, 2011
Appl. No.:
13/189454
Inventors:
Brookes H. Baker - Fort Worth TX, US
International Classification:
E04H 12/20
E04H 12/34
US Classification:
5274517, 527452
Abstract:
A method for erecting a facility for producing electrical energy from wind has the steps of preparing a site to receive the facility, including constructing foundations, and erecting an initial core tower panel and initial peripheral tower sections on their respective foundations. Work platforms and temporary guys are installed so that another core tower panel and other peripheral tower sections may be installed on top of the existing tower sections. The work platforms may then be raised, so that the process may be repeated. Shroud sectors are assembled as needed to form shrouds.
Brookes Hampton Baker from Austin, TX, age ~89 Get Report